Product comparison KeContact P30
wallbox | EDITION | ||||||||||
| Charging power | Charging power | ||||||||||
| up to 3.7 KW (single phase) | |||||||||||
| up to 7.4 KW (single phase) | |||||||||||
| up to 11 kw (3-phase) | |||||||||||
| up to 22 kw (3-phase) | |||||||||||
| Charge plug connections | Charge plug connections | ||||||||||
| Type 2 with charging cable (6 m) | |||||||||||
| Type 2 with socket | |||||||||||
| Type 2 with shutter | |||||||||||
| Load management | Load management | ||||||||||
| As master | |||||||||||
| As client | |||||||||||
| Communication interfaces | Communication interfaces | ||||||||||
| KEBA eMobility App & Portal | |||||||||||
| USB | |||||||||||
| Ethernet RJ45 | |||||||||||
| Ethernet LSA+ | |||||||||||
| UDP & Modbus TCP (passive) | |||||||||||
| Modbus TCP (active) | |||||||||||
| OCPP | |||||||||||
| WLAN | |||||||||||
| 4G / LTE | optional | ||||||||||
| ISO 15118 hardware-ready | |||||||||||
| Technical features | Technical features | ||||||||||
| Direct current fault monitoring | |||||||||||
| Approval input | |||||||||||
| Switch contact output | |||||||||||
| RFID | optional | optional | optional | ||||||||
| Energy meter (MID/ME) | Energy meter (MID/ME) | ||||||||||
| Integrated Energy meter | |||||||||||
| MID-certified | optional | optional | |||||||||
| Compliant to the German calibration law (ME) | optional | optional | |||||||||
| Design | Design | ||||||||||
| LED display | |||||||||||
| Display | |||||||||||
| Standard-Design-Cover | white | white | white | white | white | ||||||
| Custom-Design-Cover | optional | optional | optional | optional | optional | ||||||
| Climate-neutrality | Climate-neutrality | ||||||||||
| Carbon-neutral | |||||||||||
Not sure which wallbox is the right one for you? Our Wallbox-Finder will help you find the right charging station.
Digital Solutions Overview
standalone | standalone | standalone | (x & c-series as client) | (M20 & c-series as client) | (M20 & P40/ P40 Pro as client or M20 & x-series as client) | Networks | wallboxes (x-series/ P40/ P40 Pro) | ||||||||||
| eMobility Solution for hotels & companies | eMobility Solution for hotels & companies | ||||||||||||||||
| Reporting of Charging Sessions (export pdf/csv) | - | - | - | - | - | - | |||||||||||
| RFID-Card Management | - | - | - | - | - | - | |||||||||||
| Assign RFID card to user | - | - | - | - | - | - | |||||||||||
| Chargepoint overview | - | - | - | - | - | - | |||||||||||
| Start/Stop of charging Sessions | - | - | - | - | - | - | |||||||||||
| eMobility App | eMobility App | ||||||||||||||||
| Start / Stop (Pause) of charging sessions | - | - | - | - | |||||||||||||
| Set Maximum Charging Power (kW) | - | - | - | - | |||||||||||||
| CurrentWallboxStatus | - | - | - | - | |||||||||||||
| Details of current Charging Session | - | - | - | - | |||||||||||||
| Charging Session Statistics | Q1/2025 | 2025 | |||||||||||||||
| RFID card list & management | - | Q1/2025 | 2025 | ||||||||||||||
| AutomatedWallboxUpdate | - | Q1/2025 | 2025 | ||||||||||||||
| Error / Push Notifications | - | Q1/2025 | 2025 | ||||||||||||||
| Setup guide | Q1/2025 | 2025 | |||||||||||||||
| Local export of charging sessions | Q1/2025 | 2025 | |||||||||||||||
| PV-excess charging | - | - | - | - | - | ||||||||||||
| PV Boost function | - | - | - | - | - | ||||||||||||
| eMobility Portal | eMobility Portal | ||||||||||||||||
| Overview of wallboxes | - | - | - | - | - | ||||||||||||
| Wallbox Details | - | - | - | - | - | ||||||||||||
| Start / Stop (Pause) of wallbox | - | - | - | - | - | ||||||||||||
| Set Maximum Charging Power Slider (kW) | - | - | - | - | - | ||||||||||||
| Overview of charging sessions | - | Q1/2025 | 2025 | ||||||||||||||
| RFID card management | - | Q4/2024 | Q1/2025 | 2025 | Q4/2024 | ||||||||||||
| RFID card management full | Q1/2025 | - | Q1/2025 | Q1/2025 | Q1/2025 | 2025 | Q1/2025 | Q1/2025 | |||||||||
| AutomatedWallbox Update | - | Q1/2025 | 2025 | ||||||||||||||
| Settings | - | Q1/2025 | 2025 | ||||||||||||||
| Error / Push Notifications | - | Q1/2025 | 2025 | ||||||||||||||
| Tagging | - | Q4/2024 | Q1/2025 | 2025 | Q4/2024 | ||||||||||||
| Filtering | - | Q1/2025 | 2025 | ||||||||||||||
| User Management (incl. Rights & Roles), Profile Settings / Switching accounts | - | Q1/2025 | 2025 | ||||||||||||||
| Restrict user to wallbox(es) | - | Q1/2025 | 2025 | ||||||||||||||
| PV optimization | - | - | - | - | - | ||||||||||||
| Power profiles | - | Q4/2024 | Q1/2025 | 2025 | Q4/2024 | ||||||||||||
| Export charging sessions as a report locally | - | Q1/2025 | 2025 | ||||||||||||||
| Automated Charge Report | - | Q1/2025 | 2025 | ||||||||||||||
| Master-Client Network Settings | - | - | - | Q1/2025 | 2025 | - | |||||||||||
eMobility Solution for Hotels & Companies Overview
standalone | standalone | standalone | (x & c-series as client) | (M20 & c-series as client) | (M20 & P40/ P40 Pro as client or M20 & x-series as client) | Networks | wallboxes (x-series/ P40/ P40 Pro) | ||||||||||
| eMobility Solution for hotels & companies | eMobility Solution for hotels & companies | ||||||||||||||||
| Reporting of Charging Sessions (export pdf/csv) | - | - | - | - | - | - | |||||||||||
| RFID-Card Management | - | - | - | - | - | - | |||||||||||
| Assign RFID card to user | - | - | - | - | - | - | |||||||||||
| Chargepoint overview | - | - | - | - | - | - | |||||||||||
| Start/Stop of charging Sessions | - | - | - | - | - | - | |||||||||||
eMobility App Overview
standalone | standalone | standalone | (x & c-series as client) | (M20 & c-series as client) | (M20 & P40/ P40 Pro as client or M20 & x-series as client) | Networks | wallboxes (x-series/ P40/ P40 Pro) | ||||||||||
| eMobility App | eMobility App | ||||||||||||||||
| Start / Stop (Pause) of charging sessions | - | - | - | - | |||||||||||||
| Set Maximum Charging Power (kW) | - | - | - | - | |||||||||||||
| CurrentWallboxStatus | - | - | - | - | |||||||||||||
| Details of current Charging Session | - | - | - | - | |||||||||||||
| Charging Session Statistics | Q1/2025 | 2025 | |||||||||||||||
| RFID card list & management | - | Q1/2025 | 2025 | ||||||||||||||
| AutomatedWallboxUpdate | - | Q1/2025 | 2025 | ||||||||||||||
| Error / Push Notifications | - | Q1/2025 | 2025 | ||||||||||||||
| Setup guide | Q1/2025 | 2025 | |||||||||||||||
| Local export of charging sessions | Q1/2025 | 2025 | |||||||||||||||
| PV-excess charging | - | - | - | - | - | ||||||||||||
| PV Boost function | - | - | - | - | - | ||||||||||||
eMobility Portal Overview
standalone | standalone | standalone | (x & c-series as client) | (M20 & c-series as client) | (M20 & P40/ P40 Pro as client or M20 & x-series as client) | Networks | wallboxes (x-series/ P40/ P40 Pro) | ||||||||||
| eMobility Portal | eMobility Portal | ||||||||||||||||
| Overview of wallboxes | - | - | - | - | - | ||||||||||||
| Wallbox Details | - | - | - | - | - | ||||||||||||
| Start / Stop (Pause) of wallbox | - | - | - | - | - | ||||||||||||
| Set Maximum Charging Power Slider (kW) | - | - | - | - | - | ||||||||||||
| Overview of charging sessions | - | Q1/2025 | 2025 | ||||||||||||||
| RFID card management | - | Q4/2024 | Q1/2025 | 2025 | Q4/2024 | ||||||||||||
| RFID card management full | Q1/2025 | - | Q1/2025 | Q1/2025 | Q1/2025 | 2025 | Q1/2025 | Q1/2025 | |||||||||
| AutomatedWallbox Update | - | Q1/2025 | 2025 | ||||||||||||||
| Settings | - | Q1/2025 | 2025 | ||||||||||||||
| Error / Push Notifications | - | Q1/2025 | 2025 | ||||||||||||||
| Tagging | - | Q4/2024 | Q1/2025 | 2025 | Q4/2024 | ||||||||||||
| Filtering | - | Q1/2025 | 2025 | ||||||||||||||
| User Management (incl. Rights & Roles), Profile Settings / Switching accounts | - | Q1/2025 | 2025 | ||||||||||||||
| Restrict user to wallbox(es) | - | Q1/2025 | 2025 | ||||||||||||||
| PV optimization | - | - | - | - | - | ||||||||||||
| Power profiles | - | Q4/2024 | Q1/2025 | 2025 | Q4/2024 | ||||||||||||
| Export charging sessions as a report locally | - | Q1/2025 | 2025 | ||||||||||||||
| Automated Charge Report | - | Q1/2025 | 2025 | ||||||||||||||
| Master-Client Network Settings | - | - | - | Q1/2025 | 2025 | - | |||||||||||
Product comparison
wallbox | EDITION | ||||||||||
| Charging power | Charging power | ||||||||||
| up to 3.7 KW (single phase) | |||||||||||
| up to 7.4 KW (single phase) | |||||||||||
| up to 11 kw (3-phase) | |||||||||||
| up to 22 kw (3-phase) | |||||||||||
| Charge plug connections | Charge plug connections | ||||||||||
| Type 2 with charging cable (6 m) | |||||||||||
| Type 2 with socket | |||||||||||
| Type 2 with shutter | |||||||||||
| Load management | Load management | ||||||||||
| As master | |||||||||||
| As client | |||||||||||
| Communication interfaces | Communication interfaces | ||||||||||
| KEBA eMobility App & Portal | |||||||||||
| USB | |||||||||||
| Ethernet RJ45 | |||||||||||
| Ethernet LSA+ | |||||||||||
| UDP & Modbus TCP (passive) | |||||||||||
| Modbus TCP (active) | |||||||||||
| OCPP | |||||||||||
| WLAN | |||||||||||
| 4G / LTE | optional | ||||||||||
| ISO 15118 hardware-ready | |||||||||||
| Technical features | Technical features | ||||||||||
| Direct current fault monitoring | |||||||||||
| Approval input | |||||||||||
| Switch contact output | |||||||||||
| RFID | optional | optional | optional | ||||||||
| Energy meter (MID/ME) | Energy meter (MID/ME) | ||||||||||
| Integrated Energy meter | |||||||||||
| MID-certified | optional | optional | |||||||||
| Compliant to the German calibration law (ME) | optional | optional | |||||||||
| Design | Design | ||||||||||
| LED display | |||||||||||
| Display | |||||||||||
| Standard-Design-Cover | white | white | white | white | white | ||||||
| Custom-Design-Cover | optional | optional | optional | optional | optional | ||||||
| Climate-neutrality | Climate-neutrality | ||||||||||
| Carbon-neutral | |||||||||||
Videos
Get an impression of our wallbox and learn more about eMobility at KEBA
{{slideCaption}}