Timeline
KeContact P40 & P40 Pro
Phase wise roll-out plan for the KeContact P40 & P40 Pro
Both the KeContact P40 and the KeContact P40 Pro are rolled out in different hardware variants. A distinction is made between the following hardware variants:
- P40
- P40 MID variant
- P40 Pro MID variant
- P40 MessEV variant
- P40 Pro MessEV variant
Hardware versions cannot be updated automatically (unlike the software versions)
Each hardware variant can be updated to the latest software version.
Additional functions are added with each software version (1.1.0., 1.2.0 and 1.3.0.).
As soon as a new software version is available, this is communicated via push notification in the KEBA eMobility app.
Both the range of functions and the planned date of completion can be seen in the table below.
Timeline
KeContact P40 variant from November 2024 | KeContact P40 MID-variant from November 2024 | KeContact P40 Pro MID-variant from Q1 2025 | KeContact P40 MessEV-variant from Q1 2025 | KeContact P40 Pro MessEV-variant from Q1 2025 | |||||||
Equipment (ex works) Hardware | Equipment (ex works) Hardware | ||||||||||
Cable & plug | 6m Type 2 cable (EN 62196-1, VDE-AR-E 2623-2-2) | 6m Type 2 cable (EN 62196-1, VDE-AR-E 2623-2-2) | 6m Type 2 cable (EN 62196-1, VDE-AR-E 2623-2-2) | 6m Type 2 cable (EN 62196-1, VDE-AR-E 2623-2-2) | 6m Type 2 cable (EN 62196-1, VDE-AR-E 2623-2-2) | ||||||
height/width/depth | 476 mm / 221 mm / 142 mm | 476 mm / 221 mm / 142 mm | 476 mm / 221 mm / 142 mm | 476 mm / 221 mm / 142 mm | 476 mm / 221 mm / 142 mm | ||||||
1-phase/3-phase | |||||||||||
Power rating 1-phase/3-phase | 7,4 kW / 11 kW | 7,4 kW / 22 kW | 7,4 kW / 22 kW | 7,4 kW / 11 kW | 7,4 kW / 22 kW | ||||||
RCCB Type A + RDC-DD | |||||||||||
RFID | |||||||||||
WLAN | |||||||||||
LTE optional | |||||||||||
ISO 15118 Hardware ready | |||||||||||
Software Version 1.1.0. (from November 2024) | Software Version 1.1.0. (from November 2024) | ||||||||||
RFID authorization | |||||||||||
PV excess charging | |||||||||||
OCPP 1.6 | |||||||||||
Modbus TCP | |||||||||||
UK SCPR (Smart Charge Point Regulation) | |||||||||||
Software Version 1.2.0. (from Q1 2025) | Software Version 1.2.0. (from Q1 2025) | ||||||||||
Integrated phase switching | |||||||||||
EMS integration via Modbus TCP | |||||||||||
Fast Charging Button | |||||||||||
X1 control according to §14a | * | ||||||||||
P40 as client in M20 loadmanagement | |||||||||||
Software Version 1.3.0. (from Q3 2025) | Software Version 1.3.0. (from Q3 2025) | ||||||||||
Loadmanagement via X1/X2 | |||||||||||
Modbus RTU meter integration | |||||||||||
TOR for operators and users |
Your request was submitted successfully
Thank you for your request. Our KEBA Customer Support will get in touch with you soon.
Locations
Business Areas
Newsroom
Please select your preferred language
Your browser is out of date
Internet Explorer is no longer supported. Please switch to a current browser to use keba.com to its fullest extent.
Edge
Chrome
Safari
Firefox
KEBA - Automation by innovation.
{{ location.name }}
{{ location.street }}
{{ location.street2 }}
{{ location.zip }} {{ location.city }}, {{ countryName }}
{{ location.fax }}